Main missions 主要任務(wù)
1 - Ensure the level of quality in production Levels 1 & 2: 確保1、2級產(chǎn)品的質(zhì)量水平
- Take general or specific quality requirements into account 把總體的或特定的質(zhì)量要求考慮進(jìn)去
- Coordinate and approve internal and external sorting and recovery 協(xié)調和批準內部和外部的分類(lèi)和恢復
- Take part in developing the SPC when it is implemented: updating, optimization of procedures and approval of results 參與SPC實(shí)施時(shí)的開(kāi)發(fā):更新、優(yōu)化流程、批準結果
- Monitor product quality (materials, BOP, semi-finished and finished products) by product line and by customer 根據生產(chǎn)線(xiàn)和客戶(hù)的要求來(lái)監控產(chǎn)品質(zhì)量(材料,BOP,半成品和成品)
- Participate as a guarantor of methodology in handling customer and supplier quality incidents, justify choices and coordinate the progress of action plans up to completion (measuring efficiency, sharing between functions – lessons learned) 作為處理客戶(hù)和供應商質(zhì)量事故的擔保人,在完成之前,合理地選擇并協(xié)調行動(dòng)計劃的進(jìn)展(度量效率,功能之間的經(jīng)驗教訓的共享)
- Perform audits of products and their production processes and ensure the action plans are implemented 對產(chǎn)品及其生產(chǎn)過(guò)程進(jìn)行審核,確保實(shí)施行動(dòng)計劃
- Perform warranty return analysis and processing 進(jìn)行保修退貨分析和處理
- Participate in the re-evaluation of FMECAs and ensure mass-production control plans are updated 參與FMECAs的重新評估,確保批量生產(chǎn)控制計劃的更新
- Approve the modifications of the products and processes and submit EI to customers 批準產(chǎn)品和工藝的修改,并向客戶(hù)提交EI
- Conduct the initial process audit, approve the qualification of the process and confirm the qualification over time 進(jìn)行初步的工藝審核,批準工藝的資質(zhì),并隨著(zhù)時(shí)間的推移對資質(zhì)進(jìn)行確認
- Perform all the actions required within the framework of the position, with both customers and suppliers 在職責范圍內,與客戶(hù)和供應商一起完成所有必要的操作
Level 1:
- Analyze the causes and decide upon the appropriate methods and means to perform missions 分析原因,確定完成工作任務(wù)的合適方法和手段
Level 2:
- Make the necessary decisions to optimize results, in line with initial data 根據初始數據,做出必要的決策以?xún)?yōu)化結果
2 - Lead quality activities within workshops 在車(chē)間內領(lǐng)導質(zhì)量活動(dòng)
Levels 1 & 2
- Participate in APU routines and daily APU meetings with the APU Manager and shop floor team 參與APU日常事務(wù)及與APU經(jīng)理和車(chē)間團隊的日常會(huì )議
- Control and lead the establishment of quality firewalls as well as the associated results up until they are removed 控制和領(lǐng)導質(zhì)量防火墻的建立以及相關(guān)的結果直到它們被刪除
- Control quality requirements during transfers and participate in P/P qualification 在轉移過(guò)程中控制質(zhì)量要求,并參與P/P認證
- Conduct MPP audits and coordinate the progress of action plans until completion 進(jìn)行MPP檢查并協(xié)調行動(dòng)計劃的進(jìn)展直至完成
- Coordinate and approve the recovery of internal/external non-compliant parts 協(xié)調和批準內部/外部不兼容部件的修復
- Conduct training on quality tools and methods for production staff 對生產(chǎn)人員進(jìn)行質(zhì)量工具和方法的培訓
- Train production supervisors in new products/processes for deployment with production staff 在新產(chǎn)品/流程中培訓生產(chǎn)主管,以便與生產(chǎn)人員一起實(shí)施
- Participate in the development of new products (FMECA, PPQA reviews, Control equipment, etc.) in compliance with
Smart DEV 根據Smart DEV參與新產(chǎn)品的開(kāi)發(fā)(FMECA,PPQA評審、控制設備等)
- Participate in the drafting of design failures to capitalize on them and take the feedback into account 參與設計失敗的起草工作,充分利用他們,并將反饋考慮在內
- Report, according to the organization of the production unit, to the Unit Quality Manager or the APU Manager 根據公司的組織架構,向質(zhì)量經(jīng)理或生產(chǎn)經(jīng)理報告
- Block deliveries and/or stop production in the case of an identified risk for the customer. 在為客戶(hù)確定了風(fēng)險的情況下,阻止交付和(或)停止生產(chǎn)
Level 1:
- Participate in developing content for new DAQs with the Project Quality Leader and the Plant QHSE Manager 與項目質(zhì)量工程師和工廠(chǎng)質(zhì)量經(jīng)理一起參與新DAQs的內容開(kāi)發(fā)
Level 2:
- Approve new content for new DAQs in relation with the Project Quality Leader 與項目質(zhì)量工程師一起批準關(guān)于新DAQs的新內容
3 - Participate in progress management 參與進(jìn)度管理
Levels 1 & 2
- Participate in the CNQ analysis for the scope 參與CNQ范圍的分析
- Participate in action led by production on areas for improvement regarding CNQ for the scope參與由生產(chǎn)部門(mén)領(lǐng)導的有關(guān)CNQ范圍內需改進(jìn)部分的行動(dòng)
- Check the results obtained following these action plans 檢查在這些行動(dòng)計劃之后獲得的成果
- Lead working groups 領(lǐng)導工作小組
- Participate in the resolution of quality issues (progress/incidents/corrective or preventative actions) 參與解決質(zhì)量問(wèn)題(進(jìn)展/事故/糾正或預防措施)
4 - Ensure compliance with regulatory requirements and other requirements in risk management and establish Levels 1 & 2 確保符合法規要求和風(fēng)險管理中的其他要求并建立
- Update the assessment of occupational risks and environmental analysis following any incident, in the case of process modifications and at least once a year. 在任何事故發(fā)生之后更新職業(yè)風(fēng)險和環(huán)境的評估分析,在過(guò)程中進(jìn)行修改,至少每年一次
- Conduct investigations at the site and assist other managers in gathering objective information on workplace accidents or environmental incidents, the analysis of causes and the drafting of associated preventative action plans. 在工廠(chǎng)進(jìn)行調查,協(xié)助其他經(jīng)理收集工作場(chǎng)所事故或環(huán)境事故的客觀(guān)信息,分析原因,起草相關(guān)的預防行動(dòng)計劃
- Participate in Safety/Environment activities with all site personnel and coordinate action plans and working groups in the field of safety or environmental protection 與所有公司人員參加安全/環(huán)境活動(dòng),協(xié)調行動(dòng)計劃和工作小組的安全或環(huán)保工作
5 - Undertake the operational monitoring of processes and risk management inspection: 對過(guò)程進(jìn)行操作監控和風(fēng)險管理檢查
Levels 1 & 2
- Check the control plan implementation schedule is followed and the removal of associated nonconformities. 檢查控制計劃實(shí)施進(jìn)度,并去除相關(guān)的不符合項
浙江省嘉興市平湖市獨山港鎮海港路1333號4號樓
1、本站僅提供信息儲存平臺,所有信息均由用戶(hù)發(fā)布,其內容及因之產(chǎn)生的后果,均由發(fā)布者承擔,與本站無(wú)關(guān)。
2、凡告知“收取服裝費、押金、報名費等各種費用的信息均有欺詐嫌疑,請保持警惕。
我要舉報>>>